• China New Zhongzhi Charging Tray with SGS TUV
  • China New Zhongzhi Charging Tray with SGS TUV
  • China New Zhongzhi Charging Tray with SGS TUV
  • China New Zhongzhi Charging Tray with SGS TUV
  • China New Zhongzhi Charging Tray with SGS TUV
  • China New Zhongzhi Charging Tray with SGS TUV

China New Zhongzhi Charging Tray with SGS TUV

Casting Method: Thermal Gravity Casting
Process: Lost Wax Casting
Molding Technics: Gravity Casting
Application: Hardware
Material: Stainless Steel
Surface Preparation: Polishing
Samples:
US$ 10/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Detailed Photos
  • Company Profile
  • Certifications
Overview

Basic Info.

Model NO.
charging tray
Surface Roughness
Ra12.5
Machining Tolerance
+/-0.15mm
Standard
ASME
Certification
CE, RoHS, ISO 9001:2000
Transport Package
Wrapped in Seaworthy Wooden Cases or as Your Reque
Trademark
zhongzhi
Origin
China
HS Code
8455300000

Product Description

Product Description

 

Usage: Large Inventory of Cast Tray Patterns and Designs Used in all Furnace Types and Hearth Designs Such as
Batch, Continuous, Pit & Box.

Application:Metallurgica lndustry,Heat Treatment Furnaces.

Features:

1.Resistance to high temperature:Up to 1150ºC;

2.A large number of Existing Patterns of fixture for Standard.Famous Brand Heat-treatment Furnaces.

3.Rich experience in design of Trays&Baskets to suit the secific work condition.

4.More production process available:Wax lost cast process,EPC cast process,Sand cast process.

Special Features:

1. We can make High Temperature Material Trays Fixture with Lost Wax Process & EPC process & Sand Cast Process.

2. We can supply finished High Temperature Material Trays Fixture with heat-treatment and machining process.

3. We can produce heat steel castings as per GB/T 20878,DIN 17440,DIN 17224, AISI,ASTM,JIS SUH35,NF
A35- 572/584,BS970,BS1449,ISO 683/13.

Production Process:Lost Wax Process & EPC process & Sand Process, including machining process.

Quality Level: As per National Standard & International Standards. 

Chemical Composition:
 
 

Composition (%)

C

Si

Mn

S

P

Cr

Ni

Nb

1.4849

0.3-0.5

1.0-2.5

≤1.5

≤0.03

≤0.035

17.0-19.0

36.0-39.0

1.2-1.8

 
Detailed Photos


China New Zhongzhi Charging Tray with SGS TUV


 

Company Profile

 



China New Zhongzhi Charging Tray with SGS TUV

China New Zhongzhi Charging Tray with SGS TUV

China New Zhongzhi Charging Tray with SGS TUV
China New Zhongzhi Charging Tray with SGS TUV

 
Certifications

 

China New Zhongzhi Charging Tray with SGS TUV



Payment Term:

 
Payment Terms T/T EXW 30% T/T in advance, the balance to be paid before dispatch
FOB
CIF 30% T/T in advance, the balance to be paid against the copy of B/L
CFR (C&F)
L/C Irrevocable L/C at sight could be accepted if amount above US $50,000.00
Delivery Time 7 to 10 working days after receiving advanced payment




FAQ

1. When can I get the quotation?
We usually quote 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your e-mail so that we will regard your inquiry priority.

2. How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality counter display.
If you need the samples, we will charge for the sample Express fee. But the cost can be refundable after order confirmation when your quantity of the order is more about the MOQ.

3. Can you do the design for us?
Yes. We have a professional team having rich experience in design and manufacturing. Just tell us your idea and we will help to carry out your ideas. It does not matter if you do not have someone to complete files. Send us high resolution images, your logo and text and tell us how you would like to arrange them. We will send you finished files for confirmation.

4. How long can I expect to get the samples?
After you pay the sample charge and send us confirmation files, the samples will be ready for delivery in 3-7 days. You can use your own express account or prepay us if you do not have an account.

5. What about the lead time for mass production?
Honestly, it depends on the order quantity and the season you place the order. The lead time of MOQ is about 10 to 15 days. Generally speaking, we suggest that you start inquiry two months before the date you would like to get the product at your country.

6. What is your terms of delivery?
We accept EXW, FOB, C&F and CIF, etc. You can choose the one which is the most convenient or cost effective for you.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
37
Year of Establishment
2014-04-25